New EMD Electric Generator
 

The Electric Department is in the process of building the footprint for an EMD 2500 KW Generator that will be added to our existing Five (5) Generators.
 
In Construction

Update

The completion date is scheduled for May 2007.

Fiber Optic
 

A City wide Fiber Optic Network will be installed to connect all the Utility Plants and their satellites together. There will be three (3) phases to the project. Currently in the construction phase

Construction of the fiber backbone is expected to begin the summer of 2005.

Water Treatment Plant

The project is to construct a new Water Treatment Plant (WTP) to replace the existing 1937 vintage water treatment plant. The site will utilize 25 acres of City owned land and will contain two (2) reservoir's that total approximately 16.8 acres in size, a 160' x 105' building of multi levels that will house the water treatment plant, two (2) 100' x 200' process wastewater basins, and a 17' diameter by 19' high above ground water storage tank. 95% Completed January 2005

The 8.4 acre reservoir is completed. The building is  completed and treating raw water

   